Last week the machines rolled in again to dig and excavate to create the correct levels for our driveway, front porch, rear outdoor room and rear courtyard. The steel mesh and form work has also been laid out in preparation for the concrete pour on Thursday. Summit's concreter is also a great bloke who seems to be very experienced too. We've chosen an exposed aggregate concrete for the driveway.
The only problem we noted was the fact that our termite protection barrier around the side of the front porch is too high. It presently sits above the height of the garage floor (another result of the drop in garage floor height) and will need to be lowered to below this level so the concrete for the driveway can be poured over it. CG have already been informed of this and will return to rectify. They know this needs to be done by Thursday.
No comments:
Post a Comment